
Energy and Power
Energy generation is changing. Biomass, waste to energy, nuclear power generation as well as wind are gradually replacing coal fired plants. We have adapted to the new challenges presented by these larger scale projects, which include working at extreme heights, operating around preinstalled plant and lifting heavy assemblies.
We have worked on a number of prestigious projects including Ferrybridge Waste to energy, Indaver Waste to energy, Dragon, Poolbeg, Hinkley Point and Severnside Nuclear Power Stations.

West Yorkshire, England, UK
Ferrybridge
Sector: Energy
Contract Value: £9 million
Project Description: Waste to Energy Plant
Location: Yorkshire, England, UK
Client : Sisk
Scope of works: Structural Steel; erection to 55m height. Epoxy-based intumescent coating systems
Tonnage: 3,250

Milford Haven, Wales, UK
Dragon LNG
Sector: Energy and Power
Contract Value: £3.2m
Project Description: Gasification
Location: Milford Haven, Wales
Client: Dornan Engineering LTD
Scope of Works: Structural Steelwork, pipe bridges and cladding
Tonnage: 500T

Duleek, Meath, Ireland
Indaver
Sector: Energy
Contract Value: €1.7 million
Project Description: Waste to Energy Plant
Location: Duleek, Co. Meath
Client : Sisk
Scope of works: Structural Steel; erection to 45m height.
Tonnage: 1,800T

Ringsend, Dublin, Ireland
Poolbeg
Sector: Energy
Contract Value: €2.0m
Project Description: Poolbeg Waste to Energy
Location: Dublin
Client : Covanta
Scope of works: Fabrication of Boiler Frames (30T EA) and Support Columns
Tonnage:1000T

Hinkley C, Somerset, England
Hinkley Point
Sector: Energy and Power
Contract Value:£200k
Project Description: Sub-Station in powerstation
Location: Hinkley Point C, Somerset, England
Client: P.J. Carey
Scope of Works: Portal frame, support steel and galvanised support beams with cladding included
Tonnage: 50T

Severnside, England, UK
IBA Building
Sector: Energy and Power
Contract Value: £600k
Project Description: Severnside Energy Recovery centre
Location: Severnside
Client: McAlpine
Scope of Works: Energy centre and pipe racks
Tonnage: 200T