Northwall.jpg

Welcome to Steel Solutions

UK and Ireland leaders in Structural Steel Contracting

 
FINAL MAP.png

UK AND IRELAND WIDE

Having completed jobs throughout the length and breadth of the UK and Ireland, our client base and knowledge is extremely rich and diverse. Not only do we have the capacity, in our two Factories located in Fermanagh, but also the capability and contacts to provide the complete solution, wherever you are.

 

Our Locations

IMG-20200518-WA0006.jpg

Lisnaskea Site

125 Tullyneevin Road

Slush Hill, 

Clarkes Quarry, 

Lisnaskea,

Co. Fermanagh,

BT92 0FZ

Derrylin Site

Derrylin Enterprise Park,

Main Street
Derrylin
Co Fermanagh
BT92 9LA

derrylin factory.jpeg
 

Spencer Place

15-06-2020

Fabrication commences on the Spencer North Project. The project consists of a 2 10 Storey Blocks over an 80T cantilevered transfer structure.

Greenogue

10-06-2020

Works commence on the new warehouse in Greenogue.

We are hiring - ENGINEERING DESIGN MANAGER

11/05/2020

The position will be based in the Company’s Lisnaskea facility and would suit an individual with a construction engineering background.

Steel Solutions NI are one of the leading UK and Irish Structural Steel Fabricators. The Company is based in Fermanagh and is accredited ISO 9001, 14001, 18001 and is CE certified to EN1090 EXC4. Our projects cover all sectors including Retail, Office, Leisure, Energy and Stadia.

The Role

  1. The successful candidate will have a good working knowledge of engineering design within the construction industry and management of a design team.

  2. Will ideally have experience using BIM or Tekla 3D modelling software however those candidates with AutoCAD experience will also be considered.

  3. Will be able to chair design review meetings (internal and external) and close out on issues with our Clients design team.

  4. Will ensure the RFI / Technical / Drawing registers are maintained.

  5. Will ensure design changes are communicated to the design, production and commercial teams.

  6. Will undertake connection designs and record backup calculations.

Essential Requirements

  1. 1 years STRUCAD, TEKLA, or AUTOCAD experience or Master series, StatiCa or similar.

  2. IT skills including experience of Microsoft packages including Excel.

  3. Excellent communications and interpersonal skills.

  4. Ability to coordinate a design team to ensure production, procurement and Client needs are met.

  5. Manage and coordinate a design team.

NI Limited is an equal opportunities employer and welcomes applications from individuals who are under-represented in this sector.


Deadline for Applications by is Friday June 5th.

Send CV by email to: cormac@steelsolutions.ie; cormac@steelsolutions.uk.com

Job Type: Full-time, Permanent

As design manager, you will have previously performed in a similar or comparable role for a minimum of one year and have the drive and ambition to ensure that projects are delivered on budget and in a timely manner.

Excellent opportunity to develop your skills within a dynamic design team. An excellent remuneration package is available for the successful candidate.

We are hiring - Structural Detailer / Draughtsman

11/05/2020

The position will be based in the Company’s Lisnaskea facility and would suit an individual with a construction engineering background.

Steel Solutions NI are one of the leading UK and Irish Structural Steel Fabricators. The Company is based in Fermanagh and is accredited ISO 9001, 14001, 18001 and is CE certified to EN1090 EXC4.

Our projects cover all sectors including Retail, Office, Leisure, Energy and Stadia.

The Role

  1. The successful candidate will have a good working knowledge of draughting within the construction industry.

  2. Will ideally have experience using Strucad or Tekla 3D modelling software however those candidates with AutoCAD experience will also be considered.

  3. Will be able to undertake a review of design drawings and generate RFI's for missing information with regard tour scope..

  4. Will be able to liaise with our Clients design teams regarding our design.

  5. Will need to liaise with site teams to understand the site teams requirements.

Essential Requirements

  1. 1 years STRUCAD, TEKLA, or AUTOCAD experience

  2. IT skills including experience of Microsoft packages including Excel, Word and PowerPoint

  3. Excellent communications and interpersonal skills.

  4. Ability to maintain and understand drawing registers and version control.

  5. Ability to work within a team.


Steel Solutions NI Limited is an equal opportunities employer and welcomes applications from individuals who are under-represented in this sector.


Deadline for Applications by is: Friday June 5th 2020.

Send your CV by email to: Cormac@steelsolutions.ie;cormac@steelsolutions.uk.com.

Job Type: Full-time, Permanent


As a structural steel detailer, you should have previously performed a similar or comparable role for a minimum of one year and have the drive and ambition to ensure that projects are delivered on budget and in a timely manner.

Excellent opportunity to develop your skills within a dynamic design team.

Cumberland Place

Cumberland Place - Updates

16-01-2020

Steel Solutions top out the Cumberland Office Project for Fynn Management.

North Wall Quay - Complete

16-01-2020

Steel Solutions recent complete the North Wall Quay Project which consist in 7-9 Storey Block containing Office spaces.

16-01-2020

Works ongoing on the Charlemont Square Project for McGarrell Reilly, which will be occupied by Amazon.

Steel Solutions Sponsorship

15-01-2020

Through 2019 Steel Solutions were delighted to have sponsored local sports teams.


Pictured above are U 11 Clones GFC team. We were also pleased to sponsor the Clones Town U14 Soccer team.


We wish all the Clubs every success this year in their respective competitions!

Steel Solutions Sponsorship

15-01-2020

Through 2019 Steel Solutions were delighted to have sponsored local sports teams.


Pictured above are the U 11 Clones GFC team.


We wish all the Clubs every success this year in their respective competitions!

Steel Solutions Sponsorship

15-01-2020

Through 2019 Steel Solutions were delighted to have sponsored local sports teams.


Pictured above are the St Pats Donagh Ladies U14 GFC team. 


We wish all the Clubs every success this year in their respective competitions!

Battersea Power Station

26-08-2019

Steel Solution dispatch the last of 10 No 25m trusses to the Battersea Power Station project for Keltbray.

Celtic Manor- Updates

17-06-2019

The convention centre is scheduled for a soft opening in July with their first major event confirmed as the 2019 UK Space Conference in September.

Other large events already in the calendar include the Alzheimer's Research UK Conference in March next year, and more in coming years.

It will be the first of its kind in Wales, with promises of bringing thousands of visitors and events to the country's third largest city.

The £83m development, a joint venture between the Welsh Government and the Celtic Manor Resort, will provide 26,000sqm of total floor space designed to attract major events from across the world.


This facility will rival any convention facility in Europe, with its state-of-the-art auditorium, main exhibition hall and associated facilities with capacity for around 5,000 delegates, making it the largest facility of its kind in Wales or the South West of England.

With almost 3000 tonnes of steel erected, and 4 out of 5 zones completed, our combination of efficient site erection teams and streamlined fabrication process have ensured we are on schedule for completion in the coming months.

Of particular importance were the fabrication and erection of large 50m trusses. Specialized erection techniques and lifting equipment were utilized by our site teams. 

Royal Mint- Updates

15-06-2019

Steel Solutions have undertaken the enabling works for the £200 million Royal Mint Gardens development, in London. 

Working in conjunction with Network Rail, the live existing railway system currently located at the proposed development site has been encapsulated with a concrete deck to allow construction. 

Steel Solutionshas successfully built a £2m steelwork frame spanning over the encapsulated deck to allow the construction of multirise apartment blocks.

The fabrication and erection of 34 tonne plate girders has also been incorporated into this construction process. 

Pembroke Place and Herbert Park Hotel

18-07-2017

The extension of the Herbert Park Hotel and office and apartment construction at Pembroke place has recently been award to Steel Solutions.

This prestigious project includes 500T of structural steel, including complex cell beams, as well as the addition of floor decking, providing the complete solution.

Pembroke Place is located in a central area of Dublin, Ballsbridge, a key business development area with keen growth rates. 

 
 

(+44) 28 67721 799

Slush Hill, Enniskillen BT92 0FZ

©2017 by Steel Solutions NI. Proudly created with Wix.com