Having completed jobs throughout the length and breadth of the UK and Ireland, our client base and knowledge is extremely rich and diverse. Not only do we have the capacity, in our two Factories located in Fermanagh, but also the capability and contacts to provide the complete solution, wherever you are.
COOPERS CROSS COMMERCIAL
Feb, 2022
Works are progressing well on Building 1 with Building 2 to start mid-Feb
COOPERS CROSS COMMERCIAL
February 2022
Building 1 progressing well. Steel frame and decking complete to Level 5 with Building 2 commencing mid Feb.
IDA LIMERICK
January 22
Steel Solutions on our 3rd IDA Advance building in Limerick
GREENOGUE - UPDATE
January 22
Greenogue Units 3, 2 and 1 nearing completion
NEW CONTRACT AWARD
January 1, 2025
Steel Solutions are delighted to have been awarded the steel frame for the new Trinity Learning Foundry in Dublin for the renowned Trinity College. The Martin Naughton E3 Learning Foundry, designed by Feilden Clegg Bradley Studios, will be one of the most sustainable large buildings in Ireland when it is completed. The Near Zero Energy Building has been designed to BREEAM Excellent and WELL Building standards to further improve the relationship between the building and the health and wellness of the occupants.
The building consists of a two cantilevered wings on the building, with the frame consisting of a steel exoskeleton and lightweight concrete flooring.
WE ARE HIRING - STRUCTURAL DETAILER/ DRAUGHTSMAN
Jan 22
The position will be based in the Company’s Lisnaskea facility and would suit an individual with a construction engineering background.
Steel Solutions NI are one of the leading UK and Irish Structural Steel Fabricators. The Company is based in Fermanagh and is accredited ISO 9001, 14001, 18001 and is CE certified to EN1090 EXC4.
Our projects cover all sectors including Retail, Office, Leisure, Energy and Stadia.
The Role
The successful candidate will have a good working knowledge of draughting within the construction industry.
Will ideally have experience using Strucad or Tekla 3D modelling software however those candidates with AutoCAD experience will also be considered.
Will be able to undertake a review of design drawings and generate RFI's for missing information with regard tour scope..
Will be able to liaise with our Clients design teams regarding our design.
Will need to liaise with site teams to understand the site teams requirements.
Essential Requirements
1 years STRUCAD, TEKLA, or AUTOCAD experience
IT skills including experience of Microsoft packages including Excel, Word and PowerPoint
Excellent communications and interpersonal skills.
Ability to maintain and understand drawing registers and version control.
Ability to work within a team.
Steel Solutions NI Limited is an equal opportunities employer and welcomes applications from individuals who are under-represented in this sector.
Send your CV by email to: Cormac@steelsolutions.ie;cormac@steelsolutions.uk.com.
Job Type: Full-time, Permanent
As a structural steel detailer, you should have previously performed a similar or comparable role for a minimum of one year and have the drive and ambition to ensure that projects are delivered on budget and in a timely manner.
Excellent opportunity to develop your skills within a dynamic design team.
ANOTHER 2 LOAD DISPATCHED FOR SITE!
07-05-2021
I'm a paragraph. Click here to add your own text and edit me. It’s easy. Just click “Edit Text” or double click me to add your own content and make changes to the font. I’m a great place for you to tell a story and let your users know a little more about you.
FIBONACCI UPDATE
23-04-2021
First of the 50 meter & 50 tonne bridge sections complete in our Lisnaskea facility along with the first section of the atrium roof in the Derrylin facility for the Fibonacci project.
ONE WILTON - UPDATES
17-08-2020
The third bridge of three being lifted into position on Friday July 31st on the One Wilton Project for John Sisk and Sons. The bridges form access between Blocks A & B on the new LinkedIn building in Dublin.
SPENCER PLACE - UPDATES
17-08-2020
40 Ton Truss assembled for lifting into position on Spencer Norther Project for P J Hegarty's.
SPENCER PLACE
15-06-2020
Fabrication commences on the Spencer North Project. The project consists of a 2 10 Storey Blocks over an 80T cantilevered transfer structure.